WAPA
WAPA (Western Area Power Administration) required some bracing on their structures at the Byron substation. NorCal Welding was contracted by Whitefish Energy to weld 48 gussets to the structures 80′ in the air. We also identified and repaired stress cracks as needed. This job required us to use the SMAW process and 1/8″ 8018 rods.